MODEL 85 Piledriving Rig For Impact and Vibratory Hammers

  • Standard three line cable configuration.
  • New Age APE Technology makes set up in 10 minutes.
  • Simple push button hammer to vibro and quick hitch to equipment means versatility.
  • Cab based gauges for higher efficiency during pile installation.
  • Telescoping, front riding leader for work in cofferdams.
  • 45 degree leader rotation for pile orientation.

General Dimensions   m/ft
Max. Leader Height (with hammer) 24.9/81.8
Max. Leader Height (with vibro) 21.9/71.8
Max. Leader Height (with auger) 21.9/71.8
Max. Pile Length (with hammer) 16/52
Max. Pile Length (with vibro) 15/50
Max. Pile Length (with auger) 15/50


Downloads:
2008 Full Manual PDF   Size: 10.2MB
2009 Brochure   Size: 2.4MB










© 2009 American Piledriving Equipment.
If you see any missing or erroneous information, including product specifications,
please notify the IT staff at webmaster@apevibro.com