MJ Lee uses an APE 150T vibro set up in a set of APE hammer leads and utilizes the speed of this set up by driving the first 60′ x 14″ h-piles with the vibro then splicing the second 60′ h-pile and driving it to grade with an Ape D30/32 diesel hammer. They are building a railroad bridge over the Canadian river in Canadian Texas.

Share and Enjoy:
  • Facebook
  • Twitter
  • Google Buzz
  • Yahoo! Buzz
  • MySpace
  • Digg
  • StumbleUpon
  • del.icio.us
  • Add to favorites
  • Print
  • email
  • RSS