Manson Construction installs 24″ pipe dolphin for the JA Jacks Concrete Facility in South Seattle, WA.

The 200-6 and 200-6T is THE hammer for your large diameter dolphin piles, heavy concrete pile extraction and high blowcount driving when the Kong is not available.

This hammer ranges in energy from 6,600 to 8,000 inch pounds and 150-tons of line pull utilizing our patented heavy metal technology and our patented two-stage suppressor.

With its unmatched dynamic force, 100% biodegradable vegetable hydraulic oil and revolutionary electronic engine APE engineering will get your job done.

Share and Enjoy:
  • Facebook
  • Twitter
  • Google Buzz
  • Yahoo! Buzz
  • MySpace
  • Digg
  • StumbleUpon
  • del.icio.us
  • Add to favorites
  • Print
  • email
  • RSS