San Francisco, the city by the bay. California is steadily rebuilding some of its world renown monuments. Pier 19 located in San Francisco California is one of them. The rebuilding of pier 19 has been long overdue with tourism still in full swing with cruise ships coming and going out of the port. After the demoltion of the pier, the first order of things is, of course, the foundation.

Seen here, Power Engineering of Northern California is antalling 72” diameter steel pipe pile 160’ long with a 1” wall thickness. Driving these steel casings wasn’t going to be easy with all the restrictions enforced on the job. Tight work space with little room to manuever and all the regulations involved made this job a chelleng. So when they decided to take on the job, they called APE to get the equipment they needed. With the tough Merrit Sands and the sticky Bay Mud here in the bay, they chose the APE 600 Vibro to do the job. And of course the 600 vibro wouldn’t let them down, it got the pile down!

Share and Enjoy:
  • Facebook
  • Twitter
  • Google Buzz
  • Yahoo! Buzz
  • MySpace
  • Digg
  • StumbleUpon
  • del.icio.us
  • Add to favorites
  • Print
  • email
  • RSS