Preset Construction was given the task of stabilizing the Red River bank just south of Winnipeg in the small community of Morris.  The piling ranged from 7’ to 10’ diameter and from 40’ to 60’ long.  As we approached this project the concern was not driving the cans, as they were predrilled 100%.  The concern was extraction, as the clay material just above the till lens was very cohesive.  With the APE two stage suppressor capable of 180 tons of line pull, we were able to prove ourselves again even in the hard climate, as the industry leader in vibratory technology.

 